Timeframe and procedure for implementation

Rate this post

Basic implementation of a PIM system is 4-6 months of work in small iterations. Implementation of Pimcore is neurosurgery on a well-functioning tool that cannot be stopp. You cannot turn off 1C for a month.

Stages:

We conduct a study of the current architecture and data flows, the attribute model. Very often, companies do not have this and the scheme has to be restor. The ideal option is a full-time analyst of the customer, who knows the business well from the inside and is ready to share knowlge with our analyst, who knows Pimcore well. Time costs are 50-70% of the total duration of the project.

Designing the future architecture

The customer always understands why he nes Pimcore, but when it comes to implementation, then:

departmental battles may begin over data storage:  azerbaijan email list what is 1C responsible for, what is Pimcore responsible for, what is CMS responsible for, etc.

there may be a desire to implement all the accumulat “wants” at once, since you have already undertaken to revise the nomenclature. Therefore, here you have to carefully manage the risks, otherwise it is difficult to meet the deadlines.

Description of integration specifications: how the systems being integrat will exchange data.

Deploying Pimcore and setting up integrations

Training of customer representatives in basic roles and main scenarios.

Test operation.

Potential results of implementation

Information about the product range is  china numbers stor in one place in an organiz form. At the same time, the catalog structure in PIM and on the marketplace are not connect in any way. Each showcase site or marketplace is given its own catalog structure.

Departments receive constant access to current and complete information about the assortment. Access can be restrict, and changes are logg. If desir, you can see who and how chang any parameters.

The workload on employees and the number of errors are ruc thanks to the ability to centrally update information within the system and on connect trading platforms;

High-quality preparation of product range  your shipping process for peak season 2023 information requires less time and resources, since PIM accumulates data from business systems connect to it (1C, ERP, photo bank, mia server, etc.) and independently transforms them in accordance with the requirements of trading platforms;

The ne for personnel involv in preparing product content is ruc

The number of returns is ruc due to more complete and accurate product descriptions;

By setting up links between SKUs, it becomes easier to manage cross-selling and upselling, new arrivals, seasonal offers, etc.;

The time requir to control the completeness and accuracy of the enter information is ruc: the PIM system will not allow incorrect data to be enter and will notify you if it is not enter completely.

In the process of scaling, it is quite easy to connect new trading channels: marketplaces Ozon, Wildberries, Megamarket, Yandex Market, Berito, Natalie, Satom, Robo Market, etc.;

Customers feel an improvement in the quality of service and become more loyal, the NPS indicator grows.

 

You can implement PIM yourself:

Take the code from github , involve developers, study the documentation , prepare the technical specifications, deploy and configure. But if your business is not ready for experiments in the absence of official developer support, it is better to “buy CASCO”, entrusting the implementation to an experienc team. Fill out the form below, we will call you back, answer your questions, organize a meeting with an analyst to discuss your goals, budget and deadlines.

Scroll to Top